A measured survey and CAD drawing set were prepared to support a feasibility study commissioned for a project focused on a large public access site operating 24/7, with multiple levels including basement, ground floor, mezzanine, and first floor. The nature of the space presented logistical and technical challenges due to continuous access requirements and the scale of the area. |
![]() |
![]() |
Initial coordination involved reconciling several pre-existing drawing sets, many of which were inconsistent or outdated. Establishing a usable baseline required methodical verification and careful site work.
Time constraints added further complexity, with the output required on a tight schedule to meet early design programme milestones, within a complex, operational environment. |
| The final CAD package—including floorplans, sections, and elevations—was tailored to be fit for feasibility-level design exploration. | ![]() |
![]() |
| The result provided the client with a dependable foundation for assessing upgrade options. | ![]() |
![]() |